|
The Product Saver leg brackets
must be bolted to a concrete pad for anchorage. The pump must
be sized to handle the suction lift requirements for transferring
fluid to the Product Saver. Piping and components between pump
and storage tank must be compatible with petroleum products and
installed to prevent the pump from losing prime.
The Product Saver must always
be completely emptied after each application. Sight glasses should
be cleaned periodically to assure proper visual control. Manual
pump handle may be reinstalled at any angle for pumping convenience
by removing the external lock nut from the pump shaft.
Vent must always be clean of any
foreign debris. All valves should be periodically serviced to
assure their proper function. Diffuser unit may be periodically
cleaned by removing diffuser cap on opposite side of tank inlet,
and removing any foreign debris that may impair the flow through
the product saver.
Operation Instructions
1. Check gauge glasses for breakage.
Check gauge glass stop valves to be sure they are open.
2. Close all valves.
3. Open valve on storage tank.
4. Start pump and fill tank to
top by observing sight gauges.
5. Stop pump and close 2"
ball (or gate) valve to Product Saver
6. Allow water and product to
separate into layers and stabilize by observing sight glasses.
7. Open 1 1/4" water drain
valve and discharge water until product level reaches the bottom
the sight
glass assembly. Close water drain
valve.
8. Open 1 1/4" oil drain
valve and discharge product back to storage tank until Product
Saver is empty.
9. Repeat steps 4 through 8 as
often as necessary until water in storage tank is completely removed.
10. Open 1 1/4" oil and water
drain valves and and leave in open position wherever freezing
temperatures are a factor.
|